Infrastructure Day 1
From Whitespace (Hackerspace Gent)
(Difference between revisions)
Steamrunner (Talk | contribs) |
Steamrunner (Talk | contribs) |
||
| (One intermediate revision by one user not shown) | |||
| Line 5: | Line 5: | ||
|Cost=0 | |Cost=0 | ||
|Logo=HomerWorking.jpeg | |Logo=HomerWorking.jpeg | ||
| − | |Attendees=Koen, | + | |Attendees=Koen, Fs111, |
}} | }} | ||
Today we'll try to finish some infrastructure projects we started but seem to have left to the side: | Today we'll try to finish some infrastructure projects we started but seem to have left to the side: | ||
| − | * Insulation: | + | * [[Insulation]]: |
| − | * Door: | + | ** Excess insulation foam was removed. |
| + | ** More needs to be applied to finish the [[Insulation]] project. | ||
| + | |||
| + | * Door: | ||
| + | ** No work was done on installing a plate above the door. | ||
| + | |||
| + | * [[SpeakersCorner]]: | ||
| + | ** Done! | ||
{{Subpages}} | {{Subpages}} | ||
{{EventImages}} | {{EventImages}} | ||
Latest revision as of 23:20, 7 March 2011
Note: this article is about a passed event.
| Infrastructure Day 1 |
|---|
| |
| From 2011/03/06 13:30:00 to 2011/03/06 19:00:00 |
| Attendees ({{#arraydefine:a|Koen, Fs111,}}{{#arraysize:a}}warning.png"{{#arraysize:a}}" is not a number.): |
| Koen, Fs111 |
| Where: |
| Whitespace
Blekerijstraat 75, Gent, Belgium Loading map...
Costs 0 |
|
|
Today we'll try to finish some infrastructure projects we started but seem to have left to the side:
- Insulation:
- Excess insulation foam was removed.
- More needs to be applied to finish the Insulation project.
- Door:
- No work was done on installing a plate above the door.
- SpeakersCorner:
- Done!