Infrastructure Day 1

From Whitespace (Hackerspace Gent)
(Difference between revisions)
Jump to: navigation, search
 
(2 intermediate revisions by one user not shown)
Line 4: Line 4:
 
|Location=Whitespace
 
|Location=Whitespace
 
|Cost=0
 
|Cost=0
|Logo=WhitespaceLogo.gif
+
|Logo=HomerWorking.jpeg
|Attendees=Koen,
+
|Attendees=Koen, Fs111,  
 
}}
 
}}
 
Today we'll try to finish some infrastructure projects we started but seem to have left to the side:
 
Today we'll try to finish some infrastructure projects we started but seem to have left to the side:
  
* Insulation: Remove excess insulation foam, apply extra foam where it is still needed.
+
* [[Insulation]]:  
* Door: install a plate above it
+
** Excess insulation foam was removed.
 +
** More needs to be applied to finish the [[Insulation]] project.
 +
 
 +
* Door:  
 +
** No work was done on installing a plate above the door.
 +
 
 +
* [[SpeakersCorner]]:
 +
** Done!
 
{{Subpages}}
 
{{Subpages}}
 
{{EventImages}}
 
{{EventImages}}

Latest revision as of 23:20, 7 March 2011

Note: this article is about a passed event.

Infrastructure Day 1
HomerWorking.jpeg
From 2011/03/06 13:30:00 to 2011/03/06 19:00:00
Attendees ({{#arraydefine:a|Koen, Fs111,}}{{#arraysize:a}}warning.png"{{#arraysize:a}}" is not a number.):
Koen, Fs111
Where:
Whitespace Blekerijstraat 75, Gent, Belgium
Loading map...

Costs 0

Cornify

Today we'll try to finish some infrastructure projects we started but seem to have left to the side:

  • Insulation:
    • Excess insulation foam was removed.
    • More needs to be applied to finish the Insulation project.
  • Door:
    • No work was done on installing a plate above the door.

Subpages

Page "Infrastructure Day 1" has no subpages to list.


Personal tools
Namespaces

Variants
Actions
Navigation
Whitespace
Add or edit data
Hackerspaces
Toolbox