Infrastructure Day 1
From Whitespace (Hackerspace Gent)
(Difference between revisions)
Steamrunner (Talk | contribs) |
Steamrunner (Talk | contribs) |
||
| Line 9: | Line 9: | ||
Today we'll try to finish some infrastructure projects we started but seem to have left to the side: | Today we'll try to finish some infrastructure projects we started but seem to have left to the side: | ||
| − | * Insulation: Remove excess insulation foam, apply extra foam where it is still needed. | + | * [[Insulation]]: Remove excess insulation foam, apply extra foam where it is still needed. |
* Door: install a plate above it | * Door: install a plate above it | ||
{{Subpages}} | {{Subpages}} | ||
{{EventImages}} | {{EventImages}} | ||
Revision as of 18:45, 1 March 2011
Note: this article is about a passed event.
| Infrastructure Day 1 |
|---|
| |
| From 2011/03/06 13:30:00 to 2011/03/06 19:00:00 |
| Attendees ({{#arraydefine:a|Koen,}}{{#arraysize:a}}warning.png"{{#arraysize:a}}" is not a number.): |
| Koen |
| Where: |
| Whitespace
Blekerijstraat 75, Gent, Belgium Loading map...
Costs 0 |
|
|
Today we'll try to finish some infrastructure projects we started but seem to have left to the side:
- Insulation: Remove excess insulation foam, apply extra foam where it is still needed.
- Door: install a plate above it
Subpages
Page "Infrastructure Day 1" has no subpages to list.
Facts about Infrastructure Day 1RDF feed
| Has attendee | Koen + |
| Has attendee amount | |
| Has cost | 0 + |
| Has end date | 6 March 2011 19:00:00 + |
| Has event type | |
| Has location | Whitespace + |
| Has start date | 6 March 2011 13:30:00 + |