Infrastructure Day 1
From Whitespace (Hackerspace Gent)
(Difference between revisions)
Steamrunner (Talk | contribs) |
Steamrunner (Talk | contribs) |
||
| Line 4: | Line 4: | ||
|Location=Whitespace | |Location=Whitespace | ||
|Cost=0 | |Cost=0 | ||
| − | |Logo= | + | |Logo=HomerWorking.jpeg |
|Attendees=Koen, | |Attendees=Koen, | ||
}} | }} | ||
Revision as of 18:45, 1 March 2011
Note: this article is about a passed event.
| Infrastructure Day 1 |
|---|
| |
| From 2011/03/06 13:30:00 to 2011/03/06 19:00:00 |
| Attendees ({{#arraydefine:a|Koen,}}{{#arraysize:a}}warning.png"{{#arraysize:a}}" is not a number.): |
| Koen |
| Where: |
| Whitespace
Blekerijstraat 75, Gent, Belgium Loading map...
Costs 0 |
|
|
Today we'll try to finish some infrastructure projects we started but seem to have left to the side:
- Insulation: Remove excess insulation foam, apply extra foam where it is still needed.
- Door: install a plate above it
Subpages
Page "Infrastructure Day 1" has no subpages to list.
Facts about Infrastructure Day 1RDF feed
| Has attendee | Koen + |
| Has attendee amount | |
| Has cost | 0 + |
| Has end date | 6 March 2011 19:00:00 + |
| Has event type | |
| Has location | Whitespace + |
| Has start date | 6 March 2011 13:30:00 + |